Home
Technologies
Services
News
Careers
About Us
Contact Us
Technologies
Services
News
Careers
About Us
Contact Us
Sitemap
Altius Space Machines
Technologies
Services
News
Careers
About Us
Contact Us
Jobs
Electrical Engineer II/III
Updates
Altius to Contribute Technology to Robotic Arms for DoD On-Orbit Servicing
Altius Space Machines Celebrates First Successful Launch of 2022
Altius Leadership Transition
Summer 2021 Internship Cycle Update
Voyager Subsidiary, Altius Space Machines, Inc. Announces Successful First Orbital Launch of DogTags Aboard OneWeb's Satellites
New Altius Internship Program
Jon Goff on The Space Show 11/12/2019 [Updated with archive link]
What the Voyager Acquisition Means for Altius
Voyager Space Holdings to acquire Altius Space Machines
Altius Awarded SBIR Phase II for MagTag Satellite Servicing Interfaces
FCC Orbital Debris Mitigation NPRM Comment
MagTag™ Satellite Servicing Interface Workshop at Smallsat Conference
SCAF 2017 Presentation: Open Source Analysis of Iridium Failures and the Implications for Big LEO Constellations
Cryo Coupler SBIR Phase II Win
Altius Participating in the Brooke Owens Fellowship Program
A special visit by some determined young scholars
Peter Jeffris Memorial from Selenian Boondocks
These Might Be the Droids You're Looking For: Altius Selected for SBIR Ph1 Contract
Sticky Boom and Direct to Facility Patents Issued
Asteroid Boulder Retrieval System Follow-the-Build on Twitter
Altius CEO on Planetary Radio Talking About NASA's ARM Mission
Altius CEO's Asteroid Redirect Mission Op-Ed Published in SpaceNews
We've Moved!
ICYMI: Magnetoshell Vacuum Chamber Test Pictures
Space News Reports on the HatchBasket
HatchBasket™: Genesis of A Concept
MIDAS Update -- Reference Mission Destination: Titan
Recent Altius Contract Wins: What Do They Mean? (Part 2 of 2)
Recent Altius Contract Wins: What Do They Mean? (Part 1 of 2)
What We've Been Up To
Altius Comments to the USML Category XV Revision NPRM [Updated 8 July 2013]
Altius Comments to the EAR NPRM
Still Alive and Kicking
Altius Space Machines Wins Contract to Develop Touch-to-Grasp Gripper with JPL
NASASpaceFlight.com Article on the Altius/LaRC Space Act Agreement
Altius Signs Space Act Agreement with NASA Langley Research Center
Fall 2012 Internships (Updated 8/3/12)
Altius Space Machines Signs DARPA Phoenix Contract
Intern Introduction, Some Updates, and Teases
Summer and Fall 2012 Internships at Altius Space Machines [Updated 5/30/12]
Space Access 2012 Presentation
New Moonandback Interviews
Sticky Boom™ In The Media
Direct to Station (D2S™) Deliveries System
Biz Plan Pitch Video
Altius Wins NewSpace Business Plan Competition [Updated]
Altius Selected as Finalist for the 2011 NewSpace Business Plan Competition
Yesterday's Flight Highlights [Updated]
Successful Zero-G Flight Test
Zero-G Flight Tomorrow Morning
1 More Day To Zero-G: Holy Crap, It Works!
2 More Days To Zero-G: A Plan Starting To Come Together
3 More Days To Zero-G: Setbacks and Progress Or "Can You Believe We're Back to Where We Started This Morning?"
4 More Days To Zero-G: Electronics Progress and Getting On Our "Go-Go-Gadgettude"
6 More Days to Zero-G: A Few Steps Forward, and Some Back
7 More Days To Zero-G: Parts!
8 More Days To Zero-G: Boom Deployer Parts Sourcing and Test Logistics Planning
9 Days To Zero-G: Slow Progress Wednesday
Propellant Depots (An Aside)
10 Days To Zero-G: Boom Deployer Design Review
Moonandback Interviews (Updated)
11 Days To Zero-G: Gripper Rev 2a Testing
13 Days To Zero-G: Gripper Assembly and Joint-Locker Functional Test
14 Days To Zero-G: Prepping for Tomorrow's Test
15 Days To Zero-G: Boom Deployer Work, Machined Parts Shipping, etc.
16 Days To Zero-G: Ribbon Cable Demo, Parts Machining, etc.
17 Days To Zero-G: Gripper Parts Released, Rotational Sensors, and Other Electonics Stuff
18 Days To Zero-G: Gripper Design Review and Neutral-Biased Boom
4/22/2011 Update: Sticky Pads, Joint Lockers, Boom Deployers, and a Simulator Ball
4/21/2011 Sprint #2 Update
4/20/2011 Sticky Boom Sprint #2 Update
Introduction to Some New Team Members
4/19/2011 Sprint #2 Status Update
Checking in With Our Sponsors (Space Studies Institute and our Current Sprint)
Checking-in With Our Sponsors (Sticky Boom First Sprint)
Electroadhesive "Sticky Boom" Rendezvous (An Introduction and Sprint #2)
Space Show Notes
Space Show Classrom Appearance Tonight, April 5th
University of Michigan Space Entrepeneurship Talk
ISS Micro-Return Vehicle Concept
Dec 2010/Jan 2011 Update
Space Show Appearance Reminder
Nanosat Propulsion Propellant Tank Contract
Altius Congratulates SpaceX on a Job Amazingly Well Done
More About That Second Contract
Added Akismet
Building the Team
Five Control Loops
SSI Presentation and Panel Discussion
Nov 2nd Update: Joining "The Vault"
Additional Speaking Engagements
Altius Space Machines on the Space Show
Altius Space Machines Lands First Contract
Repost: The Business of Altius Space Machines
ASM Updates Blog