9 Days To Zero-G: Slow Progress Wednesday

Very short update today. To be honest today was a fairly slow day engineering-wise. We...

10 Days To Zero-G: Boom Deployer Design Review

Sorry for yet another late-night blog post, but I intend to put up some more...

11 Days To Zero-G: Gripper Rev 2a Testing

I’m not feeling very well, so I just wanted to post this bit of eyecandy...

13 Days To Zero-G: Gripper Assembly and Joint-Locker Functional Test

Quick note from tonight. It turns out that I misread an email from yesterday and...

14 Days To Zero-G: Prepping for Tomorrow’s Test

Very short blog post since it’s late and I’m getting up early tomorrow. Basic version...

15 Days To Zero-G: Boom Deployer Work, Machined Parts Shipping, etc.

It’s actually past midnight, but I figured I’d give a quick update: We made some...

16 Days To Zero-G: Ribbon Cable Demo, Parts Machining, etc.

Really quick update since it’s so late: Mike Judson prototyped our current preferred method of...

17 Days To Zero-G: Gripper Parts Released, Rotational Sensors, and Other Electonics Stuff

Ok, with only 17 more days to go until our flight, how are we doing?...

18 Days To Zero-G: Gripper Design Review and Neutral-Biased Boom

Quick updates for tonight, since it’s really late: We found out late last week that...

4/22/2011 Update: Sticky Pads, Joint Lockers, Boom Deployers, and a Simulator Ball

Quick Updates for the day: Did some brainstorming on the Sticky Pad design. We were...