17 Days To Zero-G: Gripper Parts Released, Rotational Sensors, and Other Electonics Stuff

Ok, with only 17 more days to go until our flight, how are we doing?...

18 Days To Zero-G: Gripper Design Review and Neutral-Biased Boom

Quick updates for tonight, since it’s really late: We found out late last week that...

4/22/2011 Update: Sticky Pads, Joint Lockers, Boom Deployers, and a Simulator Ball

Quick Updates for the day: Did some brainstorming on the Sticky Pad design. We were...

4/21/2011 Sprint #2 Update

I’m tired, but I wanted to give a quick update on the day. Sorry I...

4/20/2011 Sticky Boom Sprint #2 Update

Ok, now for a quick update: Worked with Kirk, Forrest, and the Red Rocks Systems...

Introduction to Some New Team Members

Before I jump into what we did today, I figured I’d give a quick intro...

4/19/2011 Sprint #2 Status Update

Ok, I also promised a quick status update. Our main progress for the day included...

Checking in With Our Sponsors (Space Studies Institute and our Current Sprint)

In addition to several of the groups from last time (SRI, Nosala Engineering, likely CD...

Checking-in With Our Sponsors (Sticky Boom First Sprint)

Before I jump into a post about what we’ve been up-to today with our Sprint...

Electroadhesive “Sticky Boom” Rendezvous (An Introduction and Sprint #2)

For those of you who missed my presentation at the annual Space Access Conference earlier...